When they were removed there was quite a lot of sealant (dum dum?) around the joints at the fire wall
.

.

.
.
.
Not only was the dumdum around the edges, but it also looked to be between the frames and the bulkhead. This appears to have done a reasonable job of keeping dirt and moisture out of the joints.
.

.
Side by side pic. Trial fit of sub frames minus sealant.They weren't particularly careful back in 1970 :-)
.

.
.
My question is this, should the sealant be replaced with a modern equivalent, or should the sub frames just be bolted direct to the firewall dry? I haven't seen this mentioned before so am hoping to get some consensus on what is considered best.
As a supplementary question, what is the general feeling about flat washers under the bolt heads? A number of the bolts screw directly into captive plates and so could likely damage paint when being tensioned.
Appreciate any feedback,
Alan